To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group

Authors

  • Oleg А. Ulytsky State Ecology Academy of postgraduate education and management, Kyiv, Ukraine
  • Victor M. Yermakov State Ecology Academy of postgraduate education and management, Kyiv, Ukraine
  • Oksana V. Lunova State Ecology Academy of postgraduate education and management, Kyiv, Ukraine
  • Katerina Y. Boiko State Ecology Academy of postgraduate education and management, Kyiv, Ukraine

DOI:

https://doi.org/10.32347/2411-4049.2019.4.32-42

Keywords:

techno-ecosystem, underground working galleries, broken hydrogeological conditions, mine water income, underground water transfer, hydro-geological connection, hydraulic connection, mine seam

Abstract

The current hydrogeological state of Selidove mine group (named after D.S. Korotchenka, Selidivs’ka, № 2 Novogrodivs’ka and № 1-3 Novogrodivs’ka) is characterized by damaged geological environment, which was derived from coal extraction. According to the geological zoning the Selidove mine group can be classified as Donetsk hard-coal basin within Chervonoarmiqs’ka monocline damaged with tectonic framework.
In this study the estimation of hydrogeological situation around the mine № 1-3 Novogrodivs’ka was performed. In undertaken the evaluation the flooding of mining galleries of № 2 Novogrodivs’ka, Selidivs’ka and, mine named after D.S. Korotchenka was taken into account. In terms of surveyor observation data the filtration of mining water from mine № 2 Novogrodivs’ka toward mine № 1 Novogrodivs’ka is possible through the nordic and south blocks, which divide the mining activities processes. The speed of flooding level change at mine № 2 Novogrodivs’ka is about 0.12 meters per day. Bearing this in mind the required time to reach the ground surface (absolute height) +185 meters is about 532 days starting from September 2019. Keeping in mind the volume of extracted underground space and the flooding factor 0.4, the common forecasted water income is about 65-130 m3 per year.
In case there is a clear hydraulic connection between separate karst voids the common income of mining water from mining galleries of № 2 Novogrodivs’ka toward mine № 1 Novogrodivs’ka will be not more than 110-175 m3 per year (taking into account the value of income through the weathering zone and aquifer karst clamp).
In order to maintain the safe working condition for employees and hydro safety at mine № 1-3 Novogrodivs’ka, it is required to implement the engineering and technical measures to pump the extra mining water (175m3) per year), which corresponds to water income from № 2 Novogrodivs’ka toward № 1 Novogrodivs’ka. It is ensured in case there is a perfect hydraulic connection between the karsts.

Author Biographies

Oleg А. Ulytsky, State Ecology Academy of postgraduate education and management, Kyiv

D. S. (Geology), Associate Professor, laureate of the State Prize of Ukraine in Science and Technology, director of the Institute for Environmental Safety and Management

Victor M. Yermakov, State Ecology Academy of postgraduate education and management, Kyiv

D. S. (Engineering), Associate Professor, laureate of the State Prize of Ukraine in Science and Technology, Head of the Center for Ecological and Resource Restoration of Donbass

Oksana V. Lunova, State Ecology Academy of postgraduate education and management, Kyiv

PhD, Associate Professor

Katerina Y. Boiko, State Ecology Academy of postgraduate education and management, Kyiv

Research assistant

References

Bogatyrenko, N. P., & Habibulin, I. S. (1994). Geologicheskij otchet o rezul'tatah geologorazvedochnyh rabot na uchastke Selidovskom Zapadnom 1/1 (uchastok 33 Selidovskij zapadnyj 1/1 i pole shahty «Selidovskaja» PO «Selidovugol'»). Artemovsk, Ukraine: PGO «Donbassgeologija». (in Russian).

Volkova, G .A., Lisjanskaja, L. A. (1982). Otchet «Oprobovanie ugol'nyh plastov i rudnichnyh vod na shahtnyh poljah na jelementy, zagrjaznjajushhie okruzhajushhuju sredu». Artemovsk, Ukraine: PGO «Donbassgeologija». (in Russian).

Usenko, V. V., Lisjanskaja, L. A. (2000). Zakljuchenie o rezul'tatah raboty «Razrabotka prognoza geofil'tracii i upravlenija podzemnymi vodami v gornom massive na pole shahty № 2 «Novogrodovskaja» GHK «Selidovugol'» i granichnyh shaht pri ejo likvidacii». Artemovsk: PGP «Artemovskaja gidropartija». (in Russian).

Usenko, V. V. (2001). Zakljuchenie o rezul'tatah raboty po ocenke sostojanija i mer po reabilitacii pruda v s. Shevchenko Krasnoarmejskogo rajona. Artemovsk: PGP «Artemovskaja gidropartija». (in Russian).

Artjomovskaja GGP. (2006). Zakljuchenie «Prognoz izmenenija jekologo-gidrogeologicheskih uslovij v granicah gornyh otvodov shahty № 2 «Novogrodovskaja», kotoraja likvidiruetsja, likvidirovannoj shahty «Selidovskaja» i shahty im. D.S. Korotchenko, kotoraja podlezhit likvidacii, a takzhe smezhnyh s nimi dejstvujushhih shaht». (in Russian).

Artjomovskaja GGP. (2015). Zakljuchenie o rezul'tatah raboty «Prognoz izmenenija jekologogidrogeologicheskih uslovij posle polnoj likvidacii shahty № 2 «Novogrodovskaja».

DRGP «Donec'kgeologija». (2015). Gidrogeologichnyj prognoz pro mozhlyvyj prytok shahtnyh vod ta zagrozu proryvu vody do VP «Shahta 1-3 «Novogrodivs'ka» DP «Selydvugillja» z zakrytoi' shahty № 2 «Novogrodivs'ka». (in Ukrainian).

Published

2019-12-26

How to Cite

Ulytsky O. А., Yermakov, V. M., Lunova, O. V., & Boiko, K. Y. (2019). To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group. Environmental Safety and Natural Resources, 32(4), 32–42. https://doi.org/10.32347/2411-4049.2019.4.32-42