Feasibility analysis of construction of new hydropower plants in Ukraine taking into account the risk of unused possibilities
DOI:
https://doi.org/10.32347/2411-4049.2019.3.33-45Keywords:
aggregate risk, alternative, decision-making, feasibility analysis, hydropower, hydropower plants, optimization, pairwise comparison, renewable energy, risk of unused possibilitiesAbstract
The article presents results of feasibility analysis of construction of new hydropower plants in Ukraine according to the Hydropower development program for the period till 2026, which was approved by our Government in 2016. In particular, there are analyzed perspective plans for building the Kakhovka hydropower plant #2 and six new hydropower plants on the river Dniester, as well as developing small hydropower in the country. The feasibility analysis is based on pairwise comparison of alternatives by the criterion of minimum aggregate risk taking into account the risk of unused opportunities. Components of aggregate risks of alternatives are estimated in dimensionless units for water-energy and operability characteristics and costs of commissioning of new hydro aggregates.References
Renewable Energy and Energy Efficiency in the 21st Century. (2018). Materials of the XIX International Scientific and Practical Conference (Kyiv, September 26-28, 2018), 674 p. (in Ukrainian).
Renewable Energy and Energy Efficiency in the 21st Century. (2019). Materials of the XX International Scientific and Practical Conference (Kyiv, May 15-16, 2019). Kyiv, Interservice, 952 p. (in Ukrainian).
Information on power and volumes of electricity production by renewable energy companies operating under the “green” tariff (as of 01.01.2017). 5 p. Retrieved from http://saee.gov.ua/sites/default/files/Info%20elektry%60ka% 20VDE.pdf. (in Ukrainian).
The power of renewable energy in 2017 has doubled. Retrieved from https://uprom.info/news/energy/potuzhnosti-vidnovlyuvanoyi-elektroenergetiki-u-2017-rotsi-zrosli-u-dva-razi/. (in Ukrainian).
Information on power and volumes of electricity produced by renewable energy objects, which have a “green” tariff (as of June 30, 2018). 4 p. Retrieved from http://saee.gov.ua/sites/default/files/RE_1_half_2018.pdf. (in Ukrainian).
Information on power and volumes of electricity produced by renewable energy objects, which have a “green” tariff (as of September 30, 2018). 4 p. Retrieved from http://saee.gov.ua/sites/default/files/VDE.pdf. (in Ukrainian).
Hydropower development program for the period up to 2026. Approved by the order of the Cabinet of Ministers of Ukraine from 13.07. 2016 № 552-r. Retrieved from http://zakon2.rada.gov.ua/laws/show/552-2016-%D1%80#n7. (in Ukrainian).
Shidlovsky, A. K., Potashnik, S. I., Fedorenko, G. M. (2005). Reliable hydropower plants are the guarantor of technological safety and efficient operation of NPPs and TPPs. Hydropower of Ukraine, № 1, 8-11. (in Ukrainian).
Development of heat power engineering and hydropower. (2013). Baseev, Ye. T., Bileka, B. D., Vasiliev, Ye. P., et al .; Science ed. Klymenko, V. M., Landau, Yu. O., Sigal, I. Ya. 399 p. Retrieved from http://energetika.in.ua/ua/books/book-3/part-2/section-2/2-8. (in Ukrainian).
Vlasyuk, Yu. S., Stefanyshyn, D. V. (2018). On problems and prospects of small hydropower engineering in Ukraine. Mathematical Modeling in Economy, №1, 2018, 126-138. (in Ukrainian).
Stefanyshyn, D. V., Vlasyuk, Yu. S. (2018). To the issue of comparative analysis of water-energy characteristics of small and large hydroelectric power plants of Ukraine being parts of waterworks with reservoirs. Mathematical Modeling in Economy, №2, 71-83. (in Ukrainian).
“Green” tariff for mini-HPP promotes the destruction of Ukrainian rivers, - WWF expert. Retrieved from https://zik.ua/news/2016/09/12/zelenyy_taryf_dlya_miniges_spryyaie_ znyshchennyu_ukrainskyh_richok__ekspert_856872. (in Ukrainian).
Stefanyshyn, D. V. (2018). On peculiarities of hydropower development in the world and in Ukraine. Environmental safety and natural resources. Issue 25 (№ 1), Kyiv, KNUBA, ITGIP of NASU, 12-23.
Stefanyshyn, D. V. (2018). Problems and prospects of hydro-accumulation in the context of rational nature management and ecologization of hydropower in Ukraine. Mathematical Modeling in Economy, №3 (12), 101-113. (in Ukrainian).
Ivashintsov D.A., Stefanishin D.V., Veksler A. B. (1993). Ecological and sociodemographic consequences of hydrotechnical construction (Problems of safety and risk). Power Technology and Engineering, Vol. 27, Issue 12, December, 685-691. DOI: 10.1007/BF01545709.
Environmental experience gained from reservoirs in operation. (1994). Trans. of the 18-th Int. Congress on Large Dams. Vol. 2. Q.69. Durban – South Africa, November, 780 p.
Stefanyshyna-Gavryliuk, Yu. D., Stefanyshyn, D. V. (2016). Decision-making in natural resources use taking into account the risk of lost opportunities based on pairwise comparison of alternatives. System Research and Information Technologies, №3, 51-62. (in Ukrainian).
Stefanyshyn, D. V. (2010). About the prospects of hydropower in Ukraine and the choice of the variant of development of the Dnipro cascade taking into account the risk. Hydropower of Ukraine, №3, 5-11. (in Ukrainian).
Stefanyshyn, D. V. (2018). Grounding the optimal scenario for the introduction of new aggregates at the hydroelectric power plants in Ukraine taking into account the risk. Hydropower of Ukraine, №3-4, 24-29. (in Ukrainian).
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2019 Dmytro V. Stefanyshyn

This work is licensed under a Creative Commons Attribution 4.0 International License.
The journal «Environmental safety and natural resources» works under Creative Commons Attribution 4.0 International (CC BY 4.0).
The licensing policy is compatible with the overwhelming majority of open access and archiving policies.